Tripp Lite Extended-Run Single-Phase Battery Cabinet Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Baterias UPS Tripp Lite Extended-Run Single-Phase Battery Cabinet. Tripp Lite Extended-Run Single-Phase Battery Cabinet User's Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 16
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
1. Introduction 2
2. Important Safety Instructions 3
3. Battery Cabinet Installation 5
3.1 Preparation 5
3.2 Transportation 5
3.3 Mechanical Check 5
3.4 Internal Wiring (Typical) 6
3.5 Preliminary Electrical Check 6
3.6 Battery Cabinet Placement 6
3.7 Electrical Connection 7
3.8 Battery Charger Electrical Connection (Select Models) 7
3.9 Final Electrical Check 7
3.10 Daisy-Chaining Multiple Battery Cabinets 8
4. Operation and Charging 9
4.1 Determine Charging Voltages 9
4.2 Initial Charge 9
4.3 Operational Check 9
4.4 Acceptance Test (Optional) 9
5. Maintenance 10
5.1 Maintenance Schedule 10
5.2 Fuse Replacement 10
6. Diagrams 11
6.1 Battery Cabinet Diagram (3 Shelves) 11
6.2 Battery and Breaker Diagrams 12
6.3 Integrated Battery Charger (Select Models) 13
7. Specifications 14
7.1 Dimensions and Floor Loading 14
7.2 Recommended Torque 14
8. Storage and Service 15
9. Warranty 15
Warranty
Registration:
register online today for a
chance to win a FREE Tripp Lite
product—
www.tripplite.com/warrant
y
Owners Manual
Extended-Run Single-Phase Battery Cabinet
Not suitable for mobile applications.
1111 W. 35th Street, Chicago, IL 60609 USA
+1.773.869.1234 • www.tripplite.com
Vista de página 0
1 2 3 4 5 6 ... 15 16

Resumo do Conteúdo

Página 1 - Owner’s Manual

1. Introduction 22. Important Safety Instructions 33. Battery Cabinet Installation 53.1 Preparation 53.2 Transportation 53.3 Mechanical Check 53

Página 2 - 1. Introduction

105. Maintenance5.1 Maintenance Schedule5.2 Fuse ReplacementQuarterly CheckMeasure individual battery unit temperature. (Measure with a digital thermo

Página 3 - SAVE THESE INSTRUCTIONS

11 6.1 Battery Cabinet Diagram (3 Shelves)6. DiagramsNote: All dimensions are in inches.28.806.0032.46.003.254.50 4.504.003.5010.5813.502.25 15.7560.0

Página 4

12 Shelf 2 Shelf 3 Shelf 1 (Bottom) To Fuse or Breaker T

Página 5

136.3 Integrated Battery Charger (Select Models)6. Diagrams (continued)6.25MAX0.512.513.5Notes:• All dimensions are in inches.• AC input is preset wit

Página 6

147.1 Dimensions and Floor Loading7.2 Recommended Torque7. SpecificationsBattery Cabinet Model ShelvesDimensions(Width x Depth x Height)Weight Floor Lo

Página 7

159. Warranty8. Storage and ServiceStorageThe battery cabinet must be stored in a clean, secure environment with a temperature less than 40° C (104° F

Página 8

200809068 93-28471111 W. 35th Street, Chicago, IL 60609 USA+1.773.869.1234 • www.tripplite.com

Página 9 - 4. Operation and Charging

21. IntroductionTripp Lite’s Extended-Run Single-Phase Battery Cabinets connect to SmartOnline 3-Phase UPS Systems to provide long-lasting battery bac

Página 10 - 5. Maintenance

32. Important Safety InstructionsSAVE THESE INSTRUCTIONS All sections of this manual contain instructions and warnings that must be followed during th

Página 11 - 6. Diagrams

42. Important Safety Instructions (continued)Battery WarningsThe battery cabinet does not require routine maintenance by the user. There are no user-s

Página 12

53.1 Preparation3.2 Transportation3.3 Mechanical Check3. Battery Cabinet InstallationRead Section 2 – Important Safety Instructions Before Installatio

Página 13

63.4 Internal Wiring (Typical)3.5 Preliminary Electrical Check3.6 Battery Cabinet Placement3. Battery Cabinet Installation (continued)Battery cabinets

Página 14 - 7. Specifications

73.7 Electrical Connection3.8 Battery Charger Electrical Connection (Select Models)3.9 Final Electrical Check3. Battery Cabinet Installation (continue

Página 15 - 8. Storage and Service

8Additional battery strings can be daisy-chained to the UPS internal battery system via a unique connector inside the UPS battery compartment (Figure

Página 16 - 200809068 93-2847

94. Operation and Charging4.1 Determine Charging Voltages4.2 Initial Charge4.3 Operational Check4.4 Acceptance Test (Optional)To determine the appropr

Comentários a estes Manuais

Sem comentários